# Intent Solutions — Mission Control reports feed

The Intent OS Mission Control program is being designed in full before it is built. This feed carries the current plan, the constitution, and the supporting standards as plain markdown so tools and agents can read them directly. **Start with the program status report — it is the single digest of where the program stands.** Security-sensitive operational documents (infrastructure topology, dependency and single-point-of-failure maps, the risk register) are not published; the authoritative full versions live in the private intent-os repository, and published copies are redacted of identifiers, addresses, secret names, and credential paths.

- Feed: <https://demos.intentsolutions.io/mission-control/feed.md>
- All reports in one file (agent one-shot fetch): <https://demos.intentsolutions.io/mission-control/all-reports.md>
- Reports directory: <https://demos.intentsolutions.io/mission-control/reports/>
- Machine index: <https://demos.intentsolutions.io/mission-control/llms.txt> · <https://demos.intentsolutions.io/mission-control/manifest.json>
- Human view: <https://demos.intentsolutions.io/mission-control/>

---

## 2026-07-11 — Current state: the full platform is being designed before it is built

**Read the [Program Status Report](reports/2026-07-11-program-status-report.md) first — it is the single digest of where Mission Control stands.**

Mission Control (the Intent OS operational platform) is being **architected in full before any code is written.** The entire program — every phase, epic, and task — is being hand-authored as a governed backlog so the build proceeds from an approved design, not guesses. Progress is measured in *design*, not shipped features.

Where things stand today:

- **Phase 0 — complete.** Discovery, the estate audit, the constitution (ADR-000), and the governance standards are documented and closed.
- **The plan is set.** The [roadmap](reports/2026-07-11-program-roadmap.md) commits the full platform build across Phases 1, 2, a technology-selection gate (2.5), 3, and a standing continuous-improvement phase — with a binding rule (ADR-000 Article V) to evaluate self-hostable open-source before SaaS and to integrate with the existing estate first.
- **Phase 1 is being hand-rolled now** — the hardening floor (off-site immutable backups, disaster-recovery rehearsal, alert resilience), the API-first schema foundation, and the verify-and-document pass.
- **Platform code shipped: 0% — by design.** Build begins only after the whole blueprint clears a final design review. An independent multi-agent audit has verified this state and hardened the plan.

The [constitution](reports/2026-07-11-adr-000-constitution.md) and the [roadmap](reports/2026-07-11-program-roadmap.md) carry the full detail; the standards (metrics, definitions of done, architecture, governance) are the supporting reference.

## 2026-07-11 — Phase 0 complete: the governance foundation (archive)

Before authorizing a multi-year build, Phase 0 produced the governable reference package — the standing test being *"if the author disappeared tomorrow, could a new senior engineer run this?"* Filed and closed: the success metrics + KPIs, the four Definitions of Done, the layered architecture (when something is a repo vs a service vs a package vs a module), the decision index, a glossary, an explicit non-goals page, and the governance calendar + ownership matrix. These are the supporting standards the current build is designed against; the security-sensitive operational documents (topology, dependency and single-point-of-failure maps, the risk register) stay private.
