Current state: the full platform is being designed before it is built
Read the Program Status Report first — it is the single digest of where Mission Control stands.
Mission Control (the Intent OS operational platform) is being architected in full before any code is written. The entire program — every phase, epic, and task — is being hand-authored as a governed backlog so the build proceeds from an approved design, not guesses. Progress is measured in *design*, not shipped features.
Where things stand today:
- Phase 0 — complete. Discovery, the estate audit, the constitution (ADR-000), and the governance standards are documented and closed.
- The plan is set. The roadmap commits the full platform build across Phases 1, 2, a technology-selection gate (2.5), 3, and a standing continuous-improvement phase — with a binding rule (ADR-000 Article V) to evaluate self-hostable open-source before SaaS and to integrate with the existing estate first.
- Phase 1 is being hand-rolled now — the hardening floor (off-site immutable backups, disaster-recovery rehearsal, alert resilience), the API-first schema foundation, and the verify-and-document pass.
- Platform code shipped: 0% — by design. Build begins only after the whole blueprint clears a final design review. An independent multi-agent audit has verified this state and hardened the plan.
The constitution and the roadmap carry the full detail; the standards (metrics, definitions of done, architecture, governance) are the supporting reference.